The project for 4 laning of Gomati Chauraha–Udaipur section of NH8 in Rajasthan has been operational since December 2015. This 79 kms long stretch NH has been developed at total cost of ~INR 1100 Cr.
The project has 2 portal twin type 6 lane tunnel at Chirwa Ghat with 3 lane Tunnel each on LHS and RHS having length 485 m and 396 m respectively. This tunnel has helped to save around 3.3 km of travel distance.
.
.
.
* Indian Roadie Infrastructure Project
No comments:
Post a Comment